Search
Now showing items 1-9 of 9
A study of green public procurement from a local authority perspective
(2009)
This dissertation outlined the development of green procurement policy at an
international, European and national level. The current culture of green procurement
was examined within Irish Public Bodies, particularly Local ...
Computer validation upgrade of the WATS application
(2009)
The reason I chose to complete my project on the upgrade of the WATS
computer application is that one of my roles within Merck Sharp and Dohme
is the WATS administrator role. As a result I am heavily involved in
computer ...
The ecology of Twite Carduelis flavirostris in Ireland
(2009)
The Twite Carduelis flavirostris is one of only three passerine species to appear
on the red list of Birds of Conservation Concern in Ireland. It is also listed in
The Irish Red Data Book of endangered species. Despite ...
% Molybdate reactive phosphorus of total phosphorus in urban wastewater influents and effluents in County Cork agglomerations >2000 P.E
(2009)
Phosphorus is a key nutrient in freshwater ecosystems as it is well known to cause severe
water quality problems when enrichment with phosphorus occurs, a phenomenon known as
eutrophication. Legislative measures are in ...
Biocide levels in surface and groundwater at IPPC licensed wood preservation sites in Ireland
(2009)
The reason the project was undertaken was to assess the level of compliance at Integrated
Pollution Prevention Control (IPPC) licensed sites using copper azole based wood
preservatives. It was found during the project ...
Validation summary report and risk assessment of AICL (KP) LIMS
(2009)
LabWare LIMS is a full-featured, configurable, enterprise Laboratory Information
Management System (LIMS). LIMS is a computerised system used to manage laboratory
samples, equipment, results, workflow, users, and results ...
Environmental management systems: improving environmental performance
(2009)
This dissertation seeks to examine environmental management systems (EMS) such as ISO 14001 and EMAS and to find out if they improve environmental performance. ISO 14001 has been in existence since 1996 and EMAS was first ...
A review of process deviations caused by human error in Rottapharm Ltd. from 2006 to 2008
(2009)
The objective of this project is to examine Process Deviation Reports (PDRs)
generated from 2006 to 2008 for Sachet Products where “Human Error” has been
identified as the primary root cause. Sachet Products were chosen ...
The successful implementation of the "OC Recovery Project" at Wyeth Medica Ireland
(2009)
Projects and project management are now in widespread use across the pharmaceutical
industry. Project size can range from something as simple as sourcing and purchasing a new
piece of office equipment to something as ...